Daftar Analisa Biaya
No.
|
Macam Pekerjaan
|
Upah
|
Bahan
|
Jumlah
|
||||
(1)
|
(2)
|
(3)
|
(4)
|
(5)
|
||||
SNI
|
1.0000
|
m3
|
Galian tanah biasa
sedalam sampai 1 meter
|
|
|
|
|
|
6.1
|
0.4000
|
org
|
Pekerja
|
@ Rp.
|
30,000.00
|
12,000.00
|
|
|
|
0.0400
|
org
|
Mandor
JUMLAH
DIBULATKAN
|
@ Rp.
|
40,000.00
|
1,600.00 13,600.00
13,600.00
|
|
13,600.00
13,600.00
|
SNI
|
1.0000
|
m3
|
Urug kembali bekas galian
|
|
|
|
|
|
6.9
|
0.1920
|
org
|
Pekerja
|
@ Rp.
|
30,000.00
|
5,760.00
|
|
|
|
0.0190
|
org
|
Mandor
JUMLAH
DIBULATKAN
|
@ Rp.
|
40,000.00
|
760.00 6,520.00
6,520.00
|
|
6,520.00
6,520.00
|
A18
|
1.0000
|
m3
|
Urug pasir
|
|
|
|
|
|
|
1.2000
|
m3
|
Pasir urug
|
@ Rp.
|
70,000.00
|
|
84,000.00
|
|
|
0.3000
|
org
|
Pekerja
|
@ Rp.
|
30,000.00
|
9,000.00
|
|
|
|
0.0100
|
org
|
Mandor
JUMLAH
DIBULATKAN
|
@ Rp.
|
40,000.00
|
400.00 9,400.00
9,400.00
|
84,000.00
84,000.00
|
93,400.00
93,400.00
|
SNI
|
1.0000
|
m3
|
Pasangan pondasi 1 Pc : 4 Ps
|
|
|
|
|
|
6.5
|
1.1000
|
m3
|
Batu belah 15/20 cm
|
@ Rp.
|
90,000.00
|
|
99,000.00
|
|
03-2836-2002
|
163.0000
|
kg
|
PC
|
@ Rp.
|
900.00
|
|
146,700.00
|
|
|
0.5200
|
m3
|
Pasir pasang
|
@ Rp.
|
80,000.00
|
|
41,600.00
|
|
|
0.6000
|
org
|
Tukang batu
|
@ Rp.
|
35,000.00
|
21,000.00
|
|
|
|
0.0600
|
org
|
Kepala tukang batu
|
@ Rp.
|
37,500.00
|
2,250.00
|
|
|
|
1.5000
|
org
|
Pekerja
|
@ Rp.
|
30,000.00
|
45,000.00
|
|
|
|
0.0750
|
org
|
Mandor
JUMLAH
DIBULATKAN
|
@ Rp.
|
40,000.00
|
3,000.00 71,250.00
71,250.00
|
287,300.00
287,300.00
|
358,550.00
358,550.00
|
SNI
|
1.0000
|
m2
|
Pasangan bata merah
tebal 1/2 bata, 1 Pc :
|
4 Ps
|
|
|
|
|
6.11
|
70.0000
|
bh
|
Bata merah 5 x 11 x 22 cm
|
@ Rp.
|
350.00
|
|
24,500.00
|
|
03-2837-2002
|
11.5000
|
kg
|
PC
|
@ Rp.
|
900.00
|
|
10,350.00
|
|
|
0.0430
|
m3
|
Pasir pasang
|
@ Rp.
|
80,000.00
|
|
3,440.00
|
|
|
0.1000
|
org
|
Tukang batu
|
@ Rp.
|
35,000.00
|
3,500.00
|
|
|
|
0.0100
|
org
|
Kepala tukang batu
|
@ Rp.
|
37,500.00
|
375.00
|
|
|
|
0.3200
|
org
|
Pekerja
|
@ Rp.
|
30,000.00
|
9,600.00
|
|
|
|
0.0150
|
org
|
Mandor
JUMLAH
DIBULATKAN
|
@ Rp.
|
40,000.00
|
600.00 14,075.00
14,075.00
|
38,290.00
38,290.00
|
52,365.00
52,365.00
|
SNI
|
1.0000
|
m2
|
Plesteran 1 Pc : 4 Ps, tebal 15 mm
|
|
|
|
|
|
6.4
|
5.2000
|
kg
|
PC
|
@ Rp.
|
764.00
|
|
3,972.80
|
|
03-2837-2002
|
0.0200
|
m3
|
Pasir pasang
|
@ Rp.
|
76,000.00
|
|
1,520.00
|
|
|
0.1500
|
org
|
Tukang batu
|
@ Rp.
|
35,000.00
|
5,250.00
|
|
|
|
0.0150
|
org
|
Kepala tukang batu
|
@ Rp.
|
37,500.00
|
562.50
|
|
|
|
0.2000
|
org
|
Pekerja
|
@ Rp.
|
30,000.00
|
6,000.00
|
|
|
|
0.0100
|
org
|
Mandor
JUMLAH
DIBULATKAN
|
@ Rp.
|
40,000.00
|
400.00 12,212.50
12,212.00
|
5,492.80
5,492.00
|
17,705.30
17,705.00
|
No.
|
Macam Pekerjaan
|
Upah
|
Bahan
|
Jumlah
|
||||
(1)
|
(2)
|
(3)
|
(4)
|
(5)
|
||||
SNI
|
1.0000
|
m2
|
Pasangan roster 25/25 cm
|
|
|
|
|
|
6.19
|
16.0000
|
bh
|
Roster 25/25 cm
|
@ Rp.
|
3,000.00
|
|
48,000.00
|
|
|
12.5000
|
kg
|
PC
|
@ Rp.
|
900.00
|
|
11,250.00
|
|
|
0.0400
|
m3
|
Pasir pasang
|
@ Rp.
|
80,000.00
|
|
3,200.00
|
|
|
0.1000
|
org
|
Tukang batu
|
@ Rp.
|
35,000.00
|
3,500.00
|
|
|
|
0.0100
|
org
|
Kepala tukang batu
|
@ Rp.
|
37,500.00
|
375.00
|
|
|
|
0.5000
|
org
|
Pekerja
|
@ Rp.
|
30,000.00
|
15,000.00
|
|
|
|
0.0250
|
org
|
Mandor
JUMLAH
DIBULATKAN
|
@ Rp.
|
40,000.00
|
1,000.00 19,875.00
19,875.00
|
62,450.00
62,450.00
|
82,325.00
82,325.00
|
AK
|
1.0000
|
m2
|
Pasang tegel keramik 30/30 berglasir
|
|
|
|
|
|
|
1.0000
|
m2
|
Tegel keramik 30/30
|
@ Rp.
|
40,000.00
|
|
40,000.00
|
|
|
4.0800
|
kg
|
PC
|
@ Rp.
|
900.00
|
|
3,672.00
|
|
|
0.0090
|
m3
|
Pasir pasang
|
@ Rp.
|
70,000.00
|
|
630.00
|
|
|
0.6000
|
kg
|
Semen putih
|
@ Rp.
|
1,500.00
|
|
900.00
|
|
|
0.5000
|
org
|
Tukang batu
|
@ Rp.
|
35,000.00
|
17,500.00
|
|
|
|
0.0500
|
org
|
Kep. Tk. Batu
|
@ Rp.
|
37,500.00
|
1,875.00
|
|
|
|
0.2500
|
org
|
Pekerja
|
@ Rp.
|
30,000.00
|
7,500.00
|
|
|
|
0.0125
|
org
|
Mandor
JUMLAH
DIBULATKAN
|
@ Rp.
|
40,000.00
|
500.00 27,375.00
27,375.00
|
45,202.00
45,202.00
|
72,577.00
72,577.00
|
|
1.0000
|
m3
|
Kolom Praktis
|
|
|
|
|
|
|
1.0000
|
m3
|
Beton site mix (1 pc: 2 ps : 3pk)
|
@ Rp.
|
600,000.00
|
|
600,000.00
|
|
|
82.3432
|
kg
|
Besi beton bjtp 24
|
@ Rp.
|
7,500.00
|
|
617,573.96
|
|
|
13.3300
|
m3
|
Bekisting
|
@ Rp.
|
80,000.00
|
|
1,066,400.00
|
|
|
1.0000
|
m3
|
Upah cor
JUMLAH DIBULATKAN
|
@ Rp.
|
125,000.00
|
125,000.00 125,000.00
125,000.00
|
2,482,029.96
2,482,029.00
|
2,607,029.96
2,607,029.00
|
|
1.0000
|
m3
|
Plat Beton Talang
|
|
|
|
|
|
|
1.0000
|
m3
|
Beton site mix (1 pc: 2 ps : 3pk)
|
@ Rp.
|
600,000.00
|
|
600,000.00
|
|
|
100.3200
|
kg
|
Besi beton bjtp 24
|
@ Rp.
|
7,500.00
|
|
752,400.00
|
|
|
10.0000
|
m3
|
Bekisting
|
@ Rp.
|
108,650.00
|
|
1,086,500.00
|
|
|
1.0000
|
m3
|
Upah cor
JUMLAH DIBULATKAN
|
@ Rp.
|
145,000.00
|
145,000.00 145,000.00
145,000.00
|
4,920,929.00
4,920,929.00
|
5,065,929.00
5,065,929.00
|
|
1.0000
|
m3
|
Sloof 15/20
|
|
|
|
|
|
|
1.0000
|
m3
|
Beton site mix (1 pc: 2 ps : 3pk)
|
@ Rp.
|
600,000.00
|
|
600,000.00
|
|
|
137.4200
|
kg
|
Besi beton bjtp 24
|
@ Rp.
|
7,500.00
|
|
1,030,650.00
|
|
|
13.3333
|
m3
|
Bekisting
|
@ Rp.
|
44,730.00
|
|
596,400.00
|
|
|
1.0000
|
m3
|
Upah cor
JUMLAH DIBULATKAN
|
@ Rp.
|
125,000.00
|
125,000.00 125,000.00
125,000.00
|
2,227,050.00
2,227,050.00
|
2,352,050.00
2,352,050.00
|
|
1.0000
|
m3
|
Beton Balok 20/30
|
|
|
|
|
|
|
1.0000
|
m3
|
Beton site mix (1 pc: 2 ps : 3pk)
|
@ Rp.
|
600,000.00
|
|
600,000.00
|
|
|
151.4167
|
kg
|
Besi beton bjtp 40
|
@ Rp.
|
9,000.00
|
|
1,362,750.00
|
|
|
77.3195
|
kg
|
Besi beton bjtp 24
|
@ Rp.
|
7,500.00
|
|
579,896.00
|
|
|
11.6667
|
m3
|
Bekisting
|
@ Rp.
|
126,800.00
|
|
1,479,333.33
|
|
|
1.0000
|
m3
|
Upah cor
JUMLAH DIBULATKAN
|
@ Rp.
|
145,000.00
|
145,000.00 145,000.00
145,000.00
|
4,021,979.33
4,021,979.00
|
4,166,979.33
4,166,979.00
|
No.
|
Macam Pekerjaan
|
Upah
|
Bahan
|
Jumlah
|
||||
(1)
|
(2)
|
(3)
|
(4)
|
(5)
|
||||
|
1.0000
|
m2
|
Pasang genteng lama
|
|
|
|
|
|
|
0.1000
|
org
|
Tukang batu
|
@ Rp.
|
35,000.00
|
3,500.00
|
|
|
|
0.0100
|
org
|
Kep. Tk. Batu
|
@ Rp-
|
37,500.00
|
375.00
|
|
|
|
0.2000
|
org
|
Pekerja
|
@ Rp-
|
30,000.00
|
6,000.00
|
|
|
|
0.0100
|
org
|
Mandor
JUMLAH
DIBULATKAN
|
@ Rp-
|
40,000.00
|
400.00 10,275.00
10,275.00
|
-
|
10,275.00
10,275.00
|
SNI
|
1.0000
|
m3
|
Pasang Goording Lama
|
|
|
|
|
|
|
0.8000
|
kg
|
Paku biasa 2" - 5"
|
@ Rp-
|
8,000.00
|
|
6,400.00
|
|
|
12.0000
|
org
|
Tukang kayu
|
@ Rp-
|
35,000.00
|
420,000.00
|
|
|
|
1.2000
|
org
|
Kepala tukang kayu
|
@ Rp-
|
37,500.00
|
45,000.00
|
|
|
|
4.0000
|
org
|
Pekerja
|
@ Rp-
|
30,000.00
|
120,000.00
|
|
|
|
0.2000
|
org
|
Mandor
JUMLAH
DIBULATKAN
|
@ Rp-
|
40,000.00
|
8,000.00 593,000.00
593,000.00
|
6,400.00
6,400.00
|
599,400.00
599,400.00
|
F.16
|
1.0000
|
m2
|
Pasang usuk 5/7, reng 2/3 lama
|
|
|
|
|
|
|
0.1500
|
kg
|
Paku usuk
|
@ Rp-
|
8,000.00
|
|
1,200.00
|
|
|
0.1000
|
kg
|
Paku reng
|
@ Rp-
|
8,000.00
|
|
800.00
|
|
|
0.1000
|
org
|
Tukang kayu
|
@ Rp-
|
35,000.00
|
3,500.00
|
|
|
|
0.0100
|
org
|
Kep. Tk. Kayu
|
@ Rp-
|
37,500.00
|
375.00
|
|
|
|
0.1000
|
org
|
Pekerja
|
@ Rp-
|
30,000.00
|
3,000.00
|
|
|
|
0.0025
|
org
|
Mandor
JUMLAH
DIBULATKAN
|
@ Rp-
|
40,000.00
|
100.00 6,975.00
6,975.00
|
2,000.00
2,000.00
|
8,975.00
8,975.00
|
SNI
|
1.0000
|
m2
|
Pengecatan tembok
baru (1 lapis plamir, 1 l
|
apis cat
|
dasar, 2 lapis c
|
at penutup)
|
|
|
6.14
|
0.1000
|
kg
|
Plamir tembok
|
@ Rp-
|
10,000.00
|
|
1,000.00
|
|
|
0.1000
|
kg
|
Cat dasar
|
@ Rp-
|
12,500.00
|
|
1,250.00
|
|
|
0.2600
|
kg
|
Cat penutup 2 x
|
@ Rp-
|
12,500.00
|
|
3,250.00
|
|
|
0.0630
|
org
|
Tukang cat
|
@ Rp-
|
35,000.00
|
2,205.00
|
|
|
|
0.0063
|
org
|
Kepala tukang cat
|
@ Rp-
|
37,500.00
|
236.25
|
|
|
|
0.0200
|
org
|
Pekerja
|
@ Rp-
|
30,000.00
|
600.00
|
|
|
|
0.0025
|
org
|
Mandor
JUMLAH
DIBULATKAN
|
@ Rp-
|
40,000.00
|
100.00 3,141.25
3,141.00
|
5,500.00
5,500.00
|
8,641.25
8,641.00
|
SNI
|
1.0000
|
m2
|
Pengecatan bidang
kayu baru (1 lapis plam
|
ir), 1 lap
|
is cat dasar, 2 la
|
pis cat penutup
|
|
|
6.8
|
0.2000
|
kg
|
Cat meni
|
@ Rp-
|
12,000.00
|
|
2,400.00
|
|
|
0.1500
|
kg
|
Plamir
|
@ Rp-
|
12,000.00
|
|
1,800.00
|
|
|
0.1700
|
kg
|
Cat dasar
|
@ Rp-
|
32,000.00
|
|
5,440.00
|
|
|
0.2600
|
kg
|
Cat penutup
|
@ Rp-
|
32,000.00
|
|
8,320.00
|
|
|
0.0900
|
org
|
Tukang cat
|
@ Rp-
|
35,000.00
|
3,150.00
|
|
|
|
0.0060
|
org
|
Kepala tukang cat
|
@ Rp-
|
37,500.00
|
225.00
|
|
|
|
0.0700
|
org
|
Pekerja
|
@ Rp-
|
30,000.00
|
2,100.00
|
|
|
|
0.0025
|
org
|
Mandor
JUMLAH
DIBULATKAN
|
@ Rp-
|
40,000.00
|
100.00 5,575.00
5,575.00
|
17,960.00
17,960.00
|
23,535.00
23,535.00
|
SNI
|
1.0000
|
m2
|
Pasang pintu alumunium
|
|
|
|
|
|
|
1.0000
|
m2
|
Pintu alumunium
|
@ Rp-
|
500,000.00
|
|
500,000.00
|
|
6.9
|
1.0500
|
org
|
Tukang besi konstruksi
|
@ Rp-
|
35,000.00
|
36,750.00
|
|
|
|
0.1050
|
org
|
Kepala tukang besi
|
@ Rp-
|
37,500.00
|
3,937.50
|
|
|
|
1.0500
|
org
|
Pekerja
|
@ Rp-
|
30,000.00
|
31,500.00
|
|
|
|
0.0052
|
org
|
Mandor
JUMLAH
DIBULATKAN
|
@ Rp-
|
40,000.00
|
208.00 72,395.50
72,395.00
|
500,000.00
500,000.00
|
572,395.50
572,395.00
|
*^ .!^PT'7= I r'-
No.
|
Macam Pekerjaan
|
Upah
|
Bahan
|
Jumlah
|
||||
(1)
|
(2)
|
(3)
|
(4)
|
(5)
|
||||
SNI
|
1.0000
|
m2
|
Pasang teralis besi
|
|
|
|
|
|
|
11.5000
|
m1
|
Baja strip 2 x 3
|
@ Rp.
|
11,000.00
|
|
126,500.00
|
|
6.12
|
1.2000
|
org
|
Tukang las
|
@ Rp.
|
35,000.00
|
42,000.00
|
|
|
|
0.0120
|
org
|
Kepala tukang las
|
@ Rp.
|
37,500.00
|
450.00
|
|
|
|
1.2000
|
org
|
Pekerja
|
@ Rp.
|
30,000.00
|
36,000.00
|
|
|
|
0.0006
|
org
|
Mandor
JUMLAH
DIBULATKAN
|
@ Rp.
|
40,000.00
|
24.00 78,474.00
78,474.00
|
126,500.00
126,500.00
|
204,974.00
204,974.00
|
H.2A
|
1.0000
|
m2
|
Pasang genteng
beton besar Natural ( isi 9 / m 2 )
|
|
|
|
|
|
|
9.0000
|
bh
|
Genteng beton natural
|
@ Rp.
|
4,000.00
|
|
36,000.00
|
|
|
0.1000
|
org
|
Tukang batu
|
@ Rp.
|
35,000.00
|
3,500.00
|
|
|
|
0.0100
|
org
|
Kep. Tk. Batu
|
@ Rp.
|
37,500.00
|
375.00
|
|
|
|
0.2000
|
org
|
Pekerja
|
@ Rp.
|
30,000.00
|
6,000.00
|
|
|
|
0.0100
|
org
|
Mandor
JUMLAH
DIBULATKAN
|
@ Rp.
|
40,000.00
|
400.00 10,275.00
10,275.00
|
36,000.00
36,000.00
|
46,275.00
46,275.00
|