Rabu, 15 Oktober 2014

RAB MASJID



Daftar Analisa Biaya

No.
Macam Pekerjaan
Upah
Bahan
Jumlah
(1)
(2)
(3)
(4)
(5)
SNI
1.0000
m3
Galian tanah biasa sedalam sampai 1 meter





6.1
0.4000
org
Pekerja
@ Rp.
30,000.00
12,000.00



0.0400
org
Mandor
JUMLAH
DIBULATKAN
@ Rp.
40,000.00
1,600.00 13,600.00
13,600.00

13,600.00
13,600.00
SNI
1.0000
m3
Urug kembali bekas galian





6.9
0.1920
org
Pekerja
@ Rp.
30,000.00
5,760.00



0.0190
org
Mandor
JUMLAH
DIBULATKAN
@ Rp.
40,000.00
760.00 6,520.00
6,520.00

6,520.00
6,520.00
A18
1.0000
m3
Urug pasir






1.2000
m3
Pasir urug
@ Rp.
70,000.00

84,000.00


0.3000
org
Pekerja
@ Rp.
30,000.00
9,000.00



0.0100
org
Mandor
JUMLAH
DIBULATKAN
@ Rp.
40,000.00
400.00 9,400.00
9,400.00
84,000.00
84,000.00
93,400.00
93,400.00
SNI
1.0000
m3
Pasangan pondasi 1 Pc : 4 Ps





6.5
1.1000
m3
Batu belah 15/20 cm
@ Rp.
90,000.00

99,000.00

03-2836-2002
163.0000
kg
PC
@ Rp.
900.00

146,700.00


0.5200
m3
Pasir pasang
@ Rp.
80,000.00

41,600.00


0.6000
org
Tukang batu
@ Rp.
35,000.00
21,000.00



0.0600
org
Kepala tukang batu
@ Rp.
37,500.00
2,250.00



1.5000
org
Pekerja
@ Rp.
30,000.00
45,000.00



0.0750
org
Mandor
JUMLAH
DIBULATKAN
@ Rp.
40,000.00
3,000.00 71,250.00
71,250.00
287,300.00
287,300.00
358,550.00
358,550.00
SNI
1.0000
m2
Pasangan bata merah tebal 1/2 bata, 1 Pc :
4 Ps




6.11
70.0000
bh
Bata merah 5 x 11 x 22 cm
@ Rp.
350.00

24,500.00

03-2837-2002
11.5000
kg
PC
@ Rp.
900.00

10,350.00


0.0430
m3
Pasir pasang
@ Rp.
80,000.00

3,440.00


0.1000
org
Tukang batu
@ Rp.
35,000.00
3,500.00



0.0100
org
Kepala tukang batu
@ Rp.
37,500.00
375.00



0.3200
org
Pekerja
@ Rp.
30,000.00
9,600.00



0.0150
org
Mandor
JUMLAH
DIBULATKAN
@ Rp.
40,000.00
600.00 14,075.00
14,075.00
38,290.00
38,290.00
52,365.00
52,365.00
SNI
1.0000
m2
Plesteran 1 Pc : 4 Ps, tebal 15 mm





6.4
5.2000
kg
PC
@ Rp.
764.00

3,972.80

03-2837-2002
0.0200
m3
Pasir pasang
@ Rp.
76,000.00

1,520.00


0.1500
org
Tukang batu
@ Rp.
35,000.00
5,250.00



0.0150
org
Kepala tukang batu
@ Rp.
37,500.00
562.50



0.2000
org
Pekerja
@ Rp.
30,000.00
6,000.00



0.0100
org
Mandor
JUMLAH
DIBULATKAN
@ Rp.
40,000.00
400.00 12,212.50
12,212.00
5,492.80
5,492.00
17,705.30
17,705.00

No.
Macam Pekerjaan
Upah
Bahan
Jumlah
(1)
(2)
(3)
(4)
(5)
SNI
1.0000
m2
Pasangan roster 25/25 cm





6.19
16.0000
bh
Roster 25/25 cm
@ Rp.
3,000.00

48,000.00


12.5000
kg
PC
@ Rp.
900.00

11,250.00


0.0400
m3
Pasir pasang
@ Rp.
80,000.00

3,200.00


0.1000
org
Tukang batu
@ Rp.
35,000.00
3,500.00



0.0100
org
Kepala tukang batu
@ Rp.
37,500.00
375.00



0.5000
org
Pekerja
@ Rp.
30,000.00
15,000.00



0.0250
org
Mandor
JUMLAH
DIBULATKAN
@ Rp.
40,000.00
1,000.00 19,875.00
19,875.00
62,450.00
62,450.00
82,325.00
82,325.00
AK
1.0000
m2
Pasang tegel keramik 30/30 berglasir






1.0000
m2
Tegel keramik 30/30
@ Rp.
40,000.00

40,000.00


4.0800
kg
PC
@ Rp.
900.00

3,672.00


0.0090
m3
Pasir pasang
@ Rp.
70,000.00

630.00


0.6000
kg
Semen putih
@ Rp.
1,500.00

900.00


0.5000
org
Tukang batu
@ Rp.
35,000.00
17,500.00



0.0500
org
Kep. Tk. Batu
@ Rp.
37,500.00
1,875.00



0.2500
org
Pekerja
@ Rp.
30,000.00
7,500.00



0.0125
org
Mandor
JUMLAH
DIBULATKAN
@ Rp.
40,000.00
500.00 27,375.00
27,375.00
45,202.00
45,202.00
72,577.00
72,577.00

1.0000
m3
Kolom Praktis






1.0000
m3
Beton site mix (1 pc: 2 ps : 3pk)
@ Rp.
600,000.00

600,000.00


82.3432
kg
Besi beton bjtp 24
@ Rp.
7,500.00

617,573.96


13.3300
m3
Bekisting
@ Rp.
80,000.00

1,066,400.00


1.0000
m3
Upah cor JUMLAH DIBULATKAN
@ Rp.
125,000.00
125,000.00 125,000.00
125,000.00
2,482,029.96
2,482,029.00
2,607,029.96
2,607,029.00

1.0000
m3
Plat Beton Talang






1.0000
m3
Beton site mix (1 pc: 2 ps : 3pk)
@ Rp.
600,000.00

600,000.00


100.3200
kg
Besi beton bjtp 24
@ Rp.
7,500.00

752,400.00


10.0000
m3
Bekisting
@ Rp.
108,650.00

1,086,500.00


1.0000
m3
Upah cor JUMLAH DIBULATKAN
@ Rp.
145,000.00
145,000.00 145,000.00
145,000.00
4,920,929.00
4,920,929.00
5,065,929.00
5,065,929.00

1.0000
m3
Sloof 15/20






1.0000
m3
Beton site mix (1 pc: 2 ps : 3pk)
@ Rp.
600,000.00

600,000.00


137.4200
kg
Besi beton bjtp 24
@ Rp.
7,500.00

1,030,650.00


13.3333
m3
Bekisting
@ Rp.
44,730.00

596,400.00


1.0000
m3
Upah cor JUMLAH DIBULATKAN
@ Rp.
125,000.00
125,000.00 125,000.00
125,000.00
2,227,050.00
2,227,050.00
2,352,050.00
2,352,050.00

1.0000
m3
Beton Balok 20/30






1.0000
m3
Beton site mix (1 pc: 2 ps : 3pk)
@ Rp.
600,000.00

600,000.00


151.4167
kg
Besi beton bjtp 40
@ Rp.
9,000.00

1,362,750.00


77.3195
kg
Besi beton bjtp 24
@ Rp.
7,500.00

579,896.00


11.6667
m3
Bekisting
@ Rp.
126,800.00

1,479,333.33


1.0000
m3
Upah cor JUMLAH DIBULATKAN
@ Rp.
145,000.00
145,000.00 145,000.00
145,000.00
4,021,979.33
4,021,979.00
4,166,979.33
4,166,979.00

No.
Macam Pekerjaan
Upah
Bahan
Jumlah
(1)
(2)
(3)
(4)
(5)

1.0000
m2
Pasang genteng lama






0.1000
org
Tukang batu
@ Rp.
35,000.00
3,500.00



0.0100
org
Kep. Tk. Batu
@ Rp-
37,500.00
375.00



0.2000
org
Pekerja
@ Rp-
30,000.00
6,000.00



0.0100
org
Mandor
JUMLAH
DIBULATKAN
@ Rp-
40,000.00
400.00 10,275.00
10,275.00
-
10,275.00
10,275.00
SNI
1.0000
m3
Pasang Goording Lama






0.8000
kg
Paku biasa 2" - 5"
@ Rp-
8,000.00

6,400.00


12.0000
org
Tukang kayu
@ Rp-
35,000.00
420,000.00



1.2000
org
Kepala tukang kayu
@ Rp-
37,500.00
45,000.00



4.0000
org
Pekerja
@ Rp-
30,000.00
120,000.00



0.2000
org
Mandor
JUMLAH
DIBULATKAN
@ Rp-
40,000.00
8,000.00 593,000.00
593,000.00
6,400.00
6,400.00
599,400.00
599,400.00
F.16
1.0000
m2
Pasang usuk 5/7, reng 2/3 lama






0.1500
kg
Paku usuk
@ Rp-
8,000.00

1,200.00


0.1000
kg
Paku reng
@ Rp-
8,000.00

800.00


0.1000
org
Tukang kayu
@ Rp-
35,000.00
3,500.00



0.0100
org
Kep. Tk. Kayu
@ Rp-
37,500.00
375.00



0.1000
org
Pekerja
@ Rp-
30,000.00
3,000.00



0.0025
org
Mandor
JUMLAH
DIBULATKAN
@ Rp-
40,000.00
100.00 6,975.00
6,975.00
2,000.00
2,000.00
8,975.00
8,975.00
SNI
1.0000
m2
Pengecatan tembok baru (1 lapis plamir, 1 l
apis cat
dasar, 2 lapis c
at penutup)


6.14
0.1000
kg
Plamir tembok
@ Rp-
10,000.00

1,000.00


0.1000
kg
Cat dasar
@ Rp-
12,500.00

1,250.00


0.2600
kg
Cat penutup 2 x
@ Rp-
12,500.00

3,250.00


0.0630
org
Tukang cat
@ Rp-
35,000.00
2,205.00



0.0063
org
Kepala tukang cat
@ Rp-
37,500.00
236.25



0.0200
org
Pekerja
@ Rp-
30,000.00
600.00



0.0025
org
Mandor
JUMLAH
DIBULATKAN
@ Rp-
40,000.00
100.00 3,141.25
3,141.00
5,500.00
5,500.00
8,641.25
8,641.00
SNI
1.0000
m2
Pengecatan bidang kayu baru (1 lapis plam
ir), 1 lap
is cat dasar, 2 la
pis cat penutup


6.8
0.2000
kg
Cat meni
@ Rp-
12,000.00

2,400.00


0.1500
kg
Plamir
@ Rp-
12,000.00

1,800.00


0.1700
kg
Cat dasar
@ Rp-
32,000.00

5,440.00


0.2600
kg
Cat penutup
@ Rp-
32,000.00

8,320.00


0.0900
org
Tukang cat
@ Rp-
35,000.00
3,150.00



0.0060
org
Kepala tukang cat
@ Rp-
37,500.00
225.00



0.0700
org
Pekerja
@ Rp-
30,000.00
2,100.00



0.0025
org
Mandor
JUMLAH
DIBULATKAN
@ Rp-
40,000.00
100.00 5,575.00
5,575.00
17,960.00
17,960.00
23,535.00
23,535.00
SNI
1.0000
m2
Pasang pintu alumunium






1.0000
m2
Pintu alumunium
@ Rp-
500,000.00

500,000.00

6.9
1.0500
org
Tukang besi konstruksi
@ Rp-
35,000.00
36,750.00



0.1050
org
Kepala tukang besi
@ Rp-
37,500.00
3,937.50



1.0500
org
Pekerja
@ Rp-
30,000.00
31,500.00



0.0052
org
Mandor
JUMLAH
DIBULATKAN
@ Rp-
40,000.00
208.00 72,395.50
72,395.00
500,000.00
500,000.00
572,395.50
572,395.00
*^   .!^PT'7= I r'-

No.
Macam Pekerjaan
Upah
Bahan
Jumlah
(1)
(2)
(3)
(4)
(5)
SNI
1.0000
m2
Pasang teralis besi






11.5000
m1
Baja strip 2 x 3
@ Rp.
11,000.00

126,500.00

6.12
1.2000
org
Tukang las
@ Rp.
35,000.00
42,000.00



0.0120
org
Kepala tukang las
@ Rp.
37,500.00
450.00



1.2000
org
Pekerja
@ Rp.
30,000.00
36,000.00



0.0006
org
Mandor
JUMLAH
DIBULATKAN
@ Rp.
40,000.00
24.00 78,474.00
78,474.00
126,500.00
126,500.00
204,974.00
204,974.00
H.2A
1.0000
m2
Pasang genteng beton besar Natural ( isi 9 / m 2 )





9.0000
bh
Genteng beton natural
@ Rp.
4,000.00

36,000.00


0.1000
org
Tukang batu
@ Rp.
35,000.00
3,500.00



0.0100
org
Kep. Tk. Batu
@ Rp.
37,500.00
375.00



0.2000
org
Pekerja
@ Rp.
30,000.00
6,000.00



0.0100
org
Mandor
JUMLAH
DIBULATKAN
@ Rp.
40,000.00
400.00 10,275.00
10,275.00
36,000.00
36,000.00
46,275.00
46,275.00


Tidak ada komentar:

Posting Komentar